eofolarin.com
Emmanuel Folarin

IT Infrastructure & Security Consultant

Web Solutions Architect

Tech Entrepreneur

  • About
  • Works
  • Services
  • Resume
  • Skills
  • Blog
  • Contact
Emmanuel Folarin

IT Infrastructure & Security Consultant

Web Solutions Architect

Tech Entrepreneur

Download CV

Recent Posts

  • The Heathrow Airport Cyberattack
  • How IT Can Enforce OneDrive Backup with Intune
  • When Small Businesses Try Every New Tech Tool
  • Introducing Eschecker 0.1
  • Nigeria’s Data Protection Act 2023: Progress or Paper Tiger?

Recent Comments

  1. Emmanuel Folarin on How IT Can Enforce OneDrive Backup with Intune
  2. Arabella3600 on Why You Keep Getting Spam and Phishing Emails in Microsoft 365
  3. Anna_Mosley on How IT Can Enforce OneDrive Backup with Intune
  4. Bright on How IT Can Enforce OneDrive Backup with Intune

Archives

  • September 2025
  • August 2025
  • July 2025
  • June 2025

Categories

  • Articles
  • Business Insight

Data Centre Revamp & Microsoft Infrastructure Deployment

  • Created By: Emmanuel
  • Date: 07/08/2012
  • Client: Eterna Plc
  • Categories: Project

In 2011, Eterna Plc operated without a formal IT infrastructure: no domain controllers, no centralized directory, no enterprise-grade servers, and relied solely on cPanel-based email for over 150 employees.

As a consultant from IPI Solutions, I was appointed Head Project Coordinator to plan, lead, and execute the company’s first-ever enterprise-grade data centre deployment, Microsoft infrastructure implementation, and domain transformation initiative.

BEFORE THE REVAMP

  • No centralized authentication or device policy

  • No domain or Active Directory structure

  • No enterprise server hardware

  • Staff used individual cPanel email accounts

  • No proper backup or recovery strategy

KEY DELIVERABLES

  • Commissioning of Hardware:

    • Procured and deployed 4x HP ProLiant DL380 G6 Servers

    • Set up rack-mounted infrastructure and UPS protection in a new mini data centre room

  • Microsoft Server & Exchange Deployment:

    • Installed Windows Server 2012 R2 Standard (for AD DS, DNS, DHCP, File Services)

    • Installed Windows Server 2008 Enterprise for Microsoft Exchange Server

    • Deployed Microsoft Exchange Server 2007 SP3 as the organization’s internal and external mail platform

  • Domain & Identity Management:

    • Established Active Directory Domain Services (AD DS) for eternaplc.com

    • Joined 130+ workstations and laptops to the domain

    • Created Group Policies (GPOs) for password policies, desktop security, drive mapping, etc.

    • Enabled Roaming Profiles for flexible logins

  • Mailbox Migration:

    • Backed up existing email accounts from cPanel into .PST format

    • Uploaded and mapped all .PST mailboxes to Microsoft Exchange mailboxes

    • Verified all mailbox integrity and staff account access

  • Network & DNS Configuration:

    • Integrated Layer 2/3 switches and built IP address schema

    • Setup DHCP & DNS roles for internal name resolution and device provisioning

    • Configured reverse DNS, MX records, and firewall rules

  • Security & Backup Strategy:

    • Configured Windows Server Backup and external backup drives

    • Implemented user permission policies, mailbox quotas, and anti-spam policies

Impact & Results

  • Transformed Eterna Plc from a non-enterprise IT setup to a fully integrated Microsoft infrastructure

  • Boosted security, authentication, and centralized IT administration

  • Improved email delivery, reliability, and archiving via Exchange

  • Laid the groundwork for future ERP systems and software integrations

  • Delivered on-time and on-budget within the 3-month timeline

Tags: Infrastructure Solutions
Share:

Next

© 2025 Emmanuel O. Folarin | Proudly Powered by eofolarin.com