eofolarin.com
Emmanuel Folarin

IT Infrastructure Developer/ Manage

Web/Mobile App Developer

Cybersecurity

IT Consultant

Emmanuel Folarin

IT Infrastructure Developer/ Manage

Web/Mobile App Developer

Cybersecurity

IT Consultant

Data Centre Revamp & Microsoft Infrastructure Deployment

  • Created By: Emmanuel
  • Date: 07/08/2012
  • Client: Eterna Plc
  • Categories: Project

In 2011, Eterna Plc operated without a formal IT infrastructure: no domain controllers, no centralized directory, no enterprise-grade servers, and relied solely on cPanel-based email for over 150 employees.

As a consultant from IPI Solutions, I was appointed Head Project Coordinator to plan, lead, and execute the company’s first-ever enterprise-grade data centre deployment, Microsoft infrastructure implementation, and domain transformation initiative.

BEFORE THE REVAMP

  • No centralized authentication or device policy

  • No domain or Active Directory structure

  • No enterprise server hardware

  • Staff used individual cPanel email accounts

  • No proper backup or recovery strategy

KEY DELIVERABLES

  • Commissioning of Hardware:

    • Procured and deployed 4x HP ProLiant DL380 G6 Servers

    • Set up rack-mounted infrastructure and UPS protection in a new mini data centre room

  • Microsoft Server & Exchange Deployment:

    • Installed Windows Server 2012 R2 Standard (for AD DS, DNS, DHCP, File Services)

    • Installed Windows Server 2008 Enterprise for Microsoft Exchange Server

    • Deployed Microsoft Exchange Server 2007 SP3 as the organization’s internal and external mail platform

  • Domain & Identity Management:

    • Established Active Directory Domain Services (AD DS) for eternaplc.com

    • Joined 130+ workstations and laptops to the domain

    • Created Group Policies (GPOs) for password policies, desktop security, drive mapping, etc.

    • Enabled Roaming Profiles for flexible logins

  • Mailbox Migration:

    • Backed up existing email accounts from cPanel into .PST format

    • Uploaded and mapped all .PST mailboxes to Microsoft Exchange mailboxes

    • Verified all mailbox integrity and staff account access

  • Network & DNS Configuration:

    • Integrated Layer 2/3 switches and built IP address schema

    • Setup DHCP & DNS roles for internal name resolution and device provisioning

    • Configured reverse DNS, MX records, and firewall rules

  • Security & Backup Strategy:

    • Configured Windows Server Backup and external backup drives

    • Implemented user permission policies, mailbox quotas, and anti-spam policies

Impact & Results

  • Transformed Eterna Plc from a non-enterprise IT setup to a fully integrated Microsoft infrastructure

  • Boosted security, authentication, and centralized IT administration

  • Improved email delivery, reliability, and archiving via Exchange

  • Laid the groundwork for future ERP systems and software integrations

  • Delivered on-time and on-budget within the 3-month timeline